🎉 Up to 70% Off Selected ItemsShop Sale
HomeStore

EVM Enbuds Air TWS Earbuds with ANC & 20H Playtime (EVM-TWS-K13)

Product image 1
1 / 5

EVM Enbuds Air TWS Earbuds with ANC & 20H Playtime (EVM-TWS-K13)

  • Brand: EVM
  • Colour: White
  • Ear Placement: In Ear
  • Form Factor: In Ear
  • Impedance: 32 Ohms


About This Item

  • Bluetooth 5.3 Technology for stable, high-speed connection
  • 20Hz – 20KHz frequency range for crystal-clear sound
  • 8 hours playtime per charge, with up to 20 hours total using charging case
  • Fast 2-hour recharge and 100 hours standby time
  • Durable & premium build with EVM’s quality warranty
$297.15

Original: $849.00

-65%
EVM Enbuds Air TWS Earbuds with ANC & 20H Playtime (EVM-TWS-K13)—

$849.00

$297.15

Product Information

Shipping & Returns

Description

  • Brand: EVM
  • Colour: White
  • Ear Placement: In Ear
  • Form Factor: In Ear
  • Impedance: 32 Ohms


About This Item

  • Bluetooth 5.3 Technology for stable, high-speed connection
  • 20Hz – 20KHz frequency range for crystal-clear sound
  • 8 hours playtime per charge, with up to 20 hours total using charging case
  • Fast 2-hour recharge and 100 hours standby time
  • Durable & premium build with EVM’s quality warranty